人人碰碰人人么免费视频人人色欧元区通胀走软 给欧洲央行刺激经济增压

發布時間︰

  “就怕匈奴人不來!”   平叟笑道︰“平氏慣為人僕,不知平遮現在在雲氏如何差遣?”人人碰   女子想必是警惕的,只有最優秀的男子才能達到目標。碰人人么免费视频   車夫們見家主揮揮手,就立刻驅趕著挽馬,快速的向陳倉方向疾馳。   問題是最後一個比較大的木盒子就讓她有些難以割舍了。人人色   梁翁湊過來小聲對雲瑯道︰“劉婆昨日里給宋家大女量衣,大女並未拒絕。老奴今日準備再去請大女挑揀頭面首飾,等到萬事俱備了,大女也就順理成章的嫁過來了。”
Previous Next

project at a glance

The Buerger Center for Advanced Pediatric Care at the Children's Hospital of Philadelphia is a 12-story, 700,000 square foot ambulatory care center with an adjacent, five-story, 1500-space underground parking garage, and an expanded central utility plant. The Center houses various ambulatory care clinics supporting outpatient diagnostics and specialty care services.  It is located beside the Colket Translational Research Building, which was also built by Turner.

Turner performed one of the largest excavations of its kind in the city of Philadelphia in order to prepare this site for the facility. Over the course of the nine-month excavation, the team excavated 70 feet down and hauled out roughly 300,000 cubic yards of rock.

In addition to building a world-class pediatric care facility, the project involved the construction of the largest green roof in Philadelphia, a sprawling 3-acre landscaped plaza.  Constructed on the roof level of the parking garage, the plaza incorporates local trees, shrubs, and flowering plants as well as four separate water fountains to create a setting that rivals a botanical garden.  The plaza alone took nearly 145,000 man-hours to complete and includes 166 trees, 3,635 shrubs, 16,366 perennials, 6,000 cubic yards of planting soil and stone mix, 30,000 square feet of stone pavers, and 10,000 square feet of stone cladding.

The project  achieved LEED Gold certification.

View this project in Turner City 2015.

Make a 3D print of the Buerger Center for Advanced Pediatric Care.

For Services / Specializations
and Additional Key Contacts
See Office Network

*Office includes a Special
Projects Division or Interiors
Group